Friday, September 17, 2010

 

Maintenance Schedule - September/October

Friday 17th September
Switch upgrade OpticGlyndwr St Asaph.
Customers at the site may see a short (3 seconds) loss of Ethernet circuit while the cables are patched between switches.

Sunday 19th September - IFL2
The Cisco switch located at C1-S5/A4 in IFL2 which supports colo equipment in Suite C4 at IFL2 will be replaced.
Patching of cables should take no more than 3 seconds for the Ethernet circuits to establish themselves on the new switch.

Monday 4th October 8pm
St Asaph, Bangor, Deeside, St Davids Park, Abergele
Our backhaul circuit over the Fibrespeed network will be upgraded between 8pm and 9pm. A brief outage is possible while the work is performed.